Our integrated project delivery method ensures the fastest delivery in the industry. The average delivery time for a modular production facility ranges from 12 to 18 months from start of detailed design to commissioning and qualification (IQ and OQ). That's 6 - 12 months faster than conventional alternatives! It is based on running multiple project steps simultaneously, and thus greatly compresses the schedule. Fabrication of your facility takes place in our workshop while preparations of the final site are done. Our approach to integrated qualification leverages our efforts in the workshop to a maximum, drastically reducing time spent on-site. This translates into tying up capital for a shorter period of time, advancing speed-to-market and revenue generation, as well as, conserving valuable company resources. Also, by being faster, you may defer your investment decision.
Our staff has extensive experience from the pharmaceutical industry. They are highly trained in pharmaceutical engineering and perform the fabrication indoors with rational and effective working procedures.
The testing of the entire plant is completed before shipment. Corrections are managed in a workshop environment. Final commissioning and qualification (IQ and OQ) are carried out after assembly at the client’s site. Our undertakings are at a fixed price and a guaranteed delivery time. This avoids unwanted technical surprises and keeps your project within budget.
|